Compare the Alternatives and Their REAL Benefits!

MANZANITA IMPROVEMENT

Comparison of Alternative Plans

ALTERNATIVE

 Alternative 1 is ‘No Project/No Improvements’

2

4-Lane Westerly Expansion

3

2-Lane with Center Left Turn

4

4-Lane Context- Sensitive Design

Neighborhood

Plan ‘B’

2-Lane with 100’ Roundabouts

Lanes

Road Right of Way

4 lanes

57’ right-of-way

3 lanes

43’ right-of-way

4 lanes

53’ right-of-way

2 lanes

with Centennial Ave left turn pockets

34’ right-of-way

KEEP RURAL LOOK AND FEEL

Bike Lane

Off-road

Off-road

Off-road

Adjacent to both sides of road

PROVIDE FOR BIKES

Pedestrian Lane

Paved

one side

Paved

one side

Paved

one side

Footpath both sides

PROVIDE FOR WALKERS/RUNNERS/HORSES

Bidwell Park “Taking” 1

155,000 sf

126,000 sf

165,000 sf

2835 sf 2

SAVE 123,000-162,000 sf

OF BIDWELL PARK

Added Traffic Lights

6

6

6

2

BIKE/PEDESTRIAN

CALL LIGHTS ONLY

Hooker Oak, Vallombrosa

Cost

$9.3 million

$3.7 million

$4.7 million

$750,000

SAVE $2.95 - $8.55 MILLION

Specimen Tree

Removal/Encroachment

99+ 87+ 97+ 5 (encroachment)
Environmental Impact OK Better OK BEST
Scenic QUALITY VERY POOR Better Poor BEST
TRAFFIC HANDLING:

Overall LOS  3

Average Speed

Travel Time Thru Corridor

 

B

21 MPH

4 min 12 sec

 

C

19 MPH

4 min 47 sec

 

B

20 MPH

4 min 30 sec

 

C

19 MPH

4 min 39 sec

Design Life

Cost Per Year

30 Years

$310,000.00

25 Years

$148.000.00

30 Years

$156.000.00

20 Years

$37,500.00

(1)     (1) Includes the area of the project connection at Wildwood Avenue & the off roadway pathways.

(2)  Includes the area to be provided for the future bus stop.              

(3) LOS = "Level of Service". City of Chico General Plan requests a score of "D" or better to be acceptable. 

 

Conclusions: Yes folks, alternative 2 would cost about $8 million dollars more than Plan B, would destroy the character of the area, promote speeding, remove about 100 mature trees, and would only save about 27 seconds in travel time thru this beautiful and scenic area. 

       Mutilate the Area, to gain 27 Seconds....and burn $8 Million Dollars.

       It's Brains vs. Asphalt!

With Plan B, Manzanita Avenue can be improved to properly handle the forecasted traffic volume AND be:

1.      Accomplished without compromising the Environment.

2.      Accomplished without cutting down any of the specimen trees along the roadway.

3.      Accomplished without “taking” any significant areas from Bidwell Park.

4.      Accomplished and improve local air quality at the same time without any cost.

5.      Accomplished and improve local water quality.

6.      Accomplished and provide bike lanes throughout the corridor.

7.      Accomplished and provide safe joggers and pedestrians crossing of Manzanita.

8.      Accomplished and provide safe equestrian crossing of Manzanita Avenue.

9.      Accomplish all of these things and many more at a cost of less than 20% of  project cost now listed in  the City of Chico Capital Improvement Program.

Next Page

Links:

Roadway Cross Section of Alternatives 2, 3 & 4 

Plan B Road Cross Section Drawing.

Plan B Drawing of Manzanita & Valombrosa Intersection.

  ** The .pdf files below are large - allow for download time **

Aerial View Drawing Alternative 2

Aerial View Drawing Alternative 3

Aerial View Drawing Alternative 4

Aerial View Drawing Alternative 5

The Complete Draft EIR from the City of Chico Reference Library

05/02/02    


Please Contact City Council With Your Thoughts On This Subject!

 

Suggestions or Comments on the Web Site, Please e-mail: manzanita@accsat.com